The base has five parts:

Office wing with various facilities of  600 m2.


The offices have large windows and wide corridors and a pleasant canteen.
Easily accessible to the production hall from both floors.

Concrete hall with a 12-tonne overhead crane and yellow heat from water.


Here there is an adjacent component workshop and wardrobes totaling 1,000 m2

Cold steel hall with 20 ton overhead crane on 420 m2


This is connected to a pressure test chamber.

Shelter with associated wardrobes of 160 m2



Borehole down to 320 meters with derrick


This is connected to premises for testing equipment and teaching.